| Job Title: |
Finishing Technician |
| Location: |
Ilfracombe |
| Salary: |
£6.5/hour |
| Description: |
Our client requires an experienced Finishing Technician for their well established Engineering Company based in North Devon.
The successful candidate must be familiar with small... more |
|
| Job Title: |
PRODUCTION SCHEDULER |
| Location: |
South Glamorgan |
| Salary: |
£2000 - £30000/annum |
| Description: |
ROLE
Manage the scheduling of the production capacity (Bulk and finishing) under consideration of inventory levels and order situation
Raise issues in terms of under – and ov... more |
|
| Job Title: |
LEATHER STITCHER / LEATHER WORKER |
| Location: |
BARNSTAPLE |
| Salary: |
£20000/annum |
| Description: |
Position: LEATHER WORKER / SKILLED LEATHER STITCHER
Location: Barnstaple
Salary: c£20K DOE + Bonus
Our client has gained the reputation for producing some of the world's ... more |
|
| Job Title: |
PROCUREMENT SUPPLY CHAIN PROFESSIONAL |
| Location: |
Cardiff |
| Salary: |
£12000 - £30000/annum Excellent package |
| Description: |
ROLE
Manage the scheduling of the production capacity (Bulk and finishing) under consideration of inventory levels and order situation
Raise issues in terms of under – and ov... more |
|
| Job Title: |
Mechanical Design Engineer |
| Location: |
South Wales |
| Salary: |
£31000 - £37000/annum |
| Description: |
Mechanical Design Engineer
Responsible for developing and verifying feasible cost effective and reliable mechanical product designs utilising computer aided design tools such as... more |
|
| Job Title: |
Toolmaker |
| Location: |
Somerset |
| Salary: |
£24000 - £25000/annum |
| Description: |
Job title: Toolmaker
Type of work: Permanent
Salary: £25000 per annum
Location: Bridgewater
My client is currently seeking to recruit a toolmaker to work for a busy manufactur... more |
|
| Job Title: |
PRODUCTION PLANNER |
| Location: |
South Wales |
| Salary: |
£12000 - £20000/annum Salary Negotiable |
| Description: |
ROLE
Manage the scheduling of the production capacity (Bulk and finishing) under consideration of inventory levels and order situation
Raise issues in terms of under – and ov... more |
|